Wau Airport Runway Expansion Feasibility Study

Teamconsult was commissioned to conduct a feasibility study for the expansion of Wau airport existing runway to cater for the anticipated increase in demand. The study included the following:

  • Assessment of the existing situation.
  • Identification and collection of required information.
  • Ground calculation analysis of the runway.
  • Assessment of future passengers, freight and airside and land side vehicular traffic.

The services provided by the consultant included:

  • Inventory of existing facilities.
  • Determining future airport facilities requirements.
  • Reviewing existing runway conditions.
  • Determining project cost.
  • Preparing of the masterplan for the runway expansion.
Project Information

Client

BADR Airlines

Sector

Planning

Area

N.A

Date

2006

Location

Khartoum, Sudan

Service

Multiple